Home Page > Microsoft > 70-664

Download Microsoft.ExamGoal.70-664.v2011-06-08.by.beecher.75q.vce

Exam: TS: Microsoft Lync Server 2010, Configuring
Size: 644.19 KB
Posted: 2011-06-08
Votes: 0
Download: Microsoft.ExamGoal.70-664.v2011-06-08.by.beecher.75q.vce

Vote For This File

Verification:*
Type the characters from the picture.

Comments

* The most recent comments are at the top.

    • Glen from Canada 04 05 2013, 3:28 PM Report Spam
      Here is another question I believe the answer provided in the dump is wrong.

      you need to improve the test cycle time, which two actions should you perform:
      The provided answers are
      A. enable code analysis
      D. Instruct the testers to use action recordings and playback during manual testing.

      I agree with D, but A makes no sense. I believe another correct answer should be B. Instruct the testers to use diagnostic data collection in their test environment. see this page
      http://msdn.microsoft.com/en-us/library/vstudio/dd286743.aspx

    • Glen from Canada 04 02 2013, 2:36 PM Report Spam
      I still don't get the question about "you are a scrum master. you need to lead the daily scrum meeting, which three questions should you ask?"

      I thought they should be
      A. what will be done before the next meeting?
      C. what has been accomplished since the last meeting?
      E. what obstacles are in the way?

      why B (what went well?), which should be be a question in retrospect meeting, not in the daily scrum!

    • SacRe from Hungary 03 28 2013, 2:41 PM Report Spam
      Questions 99% valid, answers only about 50-60%, so fail.
    • Glen from Canada 03 27 2013, 8:28 PM Report Spam
      I found this question,
      you are assigned to work on a project with an internal development team and an off-site vendor who is new, you need to ensure that the code delivered by the off-site vendor is of an acceptable quality.

      the answers are ABE

      E, implement a policy requiring developers to shelve their change at the end of each day

      this answer is definitely ridiculously wrong

      A and B make sense, and CDE all seem to be a bit off, if I have to pick one, I will choose D not E

    • SacRe from Hungary 03 26 2013, 9:41 PM Report Spam
      Your Development team reports… diagnose problems in production.
      Your need to identify standard data … they submit requests… Which two standard artifacts should you include?
      A) Test impact analysis
      C) IntelliTrace configuration file

      I don't get it how to assign production environment with test impacts and you do not need the:
      E) Name of the appliaction, server(s), and issue description.
      or
      B) Event log information

      But I cannot find any reasonable documents about this topic…

    • SacRe from Hungary 03 26 2013, 9:08 PM Report Spam
      You need to ensure that the latest release to production has not broken anything. Which two actions should you perform?
      C,D seem to me OK.

      By Jorden:
      A. Create a new build definition with your tests configured for the production URI(s). Run the tests and have TFS report success or failure.

      In my opinion: Why would you even have access to production URI(s)? You should not do anything on prod. env. with test.

    • Ruud from Netherlands 03 23 2013, 1:18 PM Report Spam
      Jorden,

      For Q9 I'd say the correct answer is:
      You need to ensure that your team communicates efficiently.
      A. Utilize visual controls, such as task boards.
      B. Co-locate team members.
      F. Conduct daily face-to-face stand-up meetings

    • Florin from Canada 03 07 2013, 6:58 AM Report Spam
      Jorden, I see you changed most of these questions just like me, based on common sense and external docs (and in a lot of them I see the same answers I produced), and still failed.

      I rest my case: this exam has plenty of wrong answers coming from Microsoft. :)

    • Jorden from Germany 03 05 2013, 8:24 AM Report Spam
      let us solve this problem:
      I have answered the following questions wrong:
      Let us search the right Answer!!!!
      Q9-
      You need to ensure that your team communicates efficiently.
      A. Utilize visual controls, such as task boards.
      C. Document the design of functionality you plan to build.
      F. Conduct daily face-to-face stand-up meetings.

      Q10-
      You need to enter the criteria into TFS for team traceability and tracking.
      A. Create test case work items for each criterion in the spreadsheet. Link the test case work items with the work item(s) for the appropriate requirements
      D. Create a new quality of service test case work item for each criterion in the spreadsheet. Link the quality of service test case work items with the work item(s) for the appropriate requirements.
      Q11-
      You need to prioritize the requirements and ensure that the updates are reflected on the TFS reports.
      A. Set the Priority to 1 for each of the high-value requirements.
      B. Use Microsoft Project.
      Q12-Which three activities or elements should you include in your plan?
      A. Probability assessment
      B. Assumptions
      D. Impact analysis
      Q13
      You need to work with the development team to estimate when the release will be completed. Which three actions should you perform?
      B. Review the product backlog with the Forecast option set to on to determine if the release can be completed based on the team's velocity.
      C. Have the team create tasks for each item in the product backlog and assign hour estimates to the task.
      G. Estimate effort for each item in the product backlog.

      Q14You need to ensure that the latest release to production has not broken anything. Which two actions should you perform?
      A. Create a new build definition with your tests configured for the production URI(s). Run the tests and have TFS report success or failure.
      D. Create a complete set of unit test projects within Microsoft Visual Studio 2012.

    • Jorden from Germany 03 05 2013, 8:23 AM Report Spam
      let us solve this problem:
      I have answered the following questions wrong:
      Let us search the right Answer!!!!
      Q5-You need to identify standard data that the operations team should provide when they submit requests to the development team?
      Event log information.
      Name of the application, server(s), and issue description
      Q6-You need to monitor your company's application infrastructure
      Operations Manager

      Q7-
      The stakeholders are concerned that several of the project requirements will not meet their needs due to changing market conditions..?

      C. Instruct the team to create a comprehensive set of design documents for each layer of the system. Schedule a review with the stakeholders to get their feedback. D. Add a primary stakeholder to your team as the product owner

      Q8-Which three features should you use?
      C. Unit testing and code coverage
      D. Requirements management
      E. Deployment to production

    • Jorden from Germany 03 05 2013, 8:22 AM Report Spam
      let us solve this problem:
      I have answered the following questions wrong:
      Let us search the right Answer!!!!
      Q1-document a flexibility matrix / My answer was (Scope,schedule, cost or resources)
      Q2-You know the team's capacity and the planned sprint duration. You need to plan the release schedule based on your existing backlog?
      Ask the development team to provide high level estimates to complete each PBI
      Assign the PBIs to different sprints to define the release
      Schedule the release using the Iteration Planning workbook

      Q3-You need to create an efficient and flexible method to automate the deployment of the website when requested by the test team.
      C. Customize the CodeBuild workflow to copy the website from the build drop folder to the IIS web directory on the test VM…..

      Q4-You need to identify the return on investment (ROI) of implementing an ALM strategy?

      BLatest best-of-breed tools specific for each role
      C. Improved product quality
      D. Shortened development cycles

    • Florin from Canada 03 04 2013, 2:38 AM Report Spam
      All exam questions (49) are from this dump (detected 73 unique questions), which is good. I tried to identify the ~30% questions with wrong answers, based on knowledge, common sense, external doc, and correct those supposed with wrong answers.

      I was passing my "dump" with 100% one day before the exam. However I failed, with below 60%, which honestly surprised me a lot. Some "real" answers might be pure crap at the actual exam.

    • Rachel from Sweden 02 27 2013, 8:26 AM Report Spam
      Fail. Questions are valid, but many answers are not.
    • Bretten from Germany 02 25 2013, 12:59 PM Report Spam
      fail. many question with the wrong answer ,too risky. do not use it.
    • Thiago from Brazil 02 22 2013, 1:01 PM Report Spam
      many questions with the wrong answers, too risky
    • Ken from Switzerland 02 12 2013, 12:06 PM Report Spam
      Questions valid, just passed the exam. Around 15 provided answers are wrong.
    • David from Switzerland 01 25 2013, 6:58 PM Report Spam
      Valid , thanks for good share.
    • Tom from Unknown 01 25 2013, 6:56 PM Report Spam
      Just passed this test. Cert4Prep.com is going good for me too.

Close

Site Search:

Site Search:

Terms of Service

Proudly powered by www.iexamcollection.com